The Solar Park Tesárske Mlyňany was commissioned in 2010 and consists of two separate power plants with capacities of 0.999 MWp and 1.200 MWp, each with its own connection point to the distribution grid. The total installed capacity of the park is 2.199 MWp. Its annual electricity production reaches approximately 2,350,000 kWh, which corresponds to the consumption of around 560 households.
Solar Park Tesárske Mlyňany
Start of operation
2010

About project
A total of 29,360 First Solar thin film panels are installed across an area of 76,500 m², resulting in savings of approximately 1,645 tons of CO₂ annually. Both projects are owned by the WEON Group.
In numbers
Total power
2,199 MWp
Annual production
~ 2 350 000 kWh
Coverage of consumption
560 households per year
Emissions savings
~ 1 645 tons of CO₂



















