Solar Park Tesárske Mlyňany

Start of operation

2010

Solárny park Tesárske Mlyňany od green energy slovakia

About project

The Solar Park Tesárske Mlyňany was commissioned in 2010 and consists of two separate power plants with capacities of 0.999 MWp and 1.200 MWp, each with its own connection point to the distribution grid. The total installed capacity of the park is 2.199 MWp. Its annual electricity production reaches approximately 2,350,000 kWh, which corresponds to the consumption of around 560 households.

A total of 29,360 First Solar thin film panels are installed across an area of 76,500 m², resulting in savings of approximately 1,645 tons of CO₂ annually. Both projects are owned by the WEON Group.

In numbers

Total power

2,199 MWp

Annual production

~ 2 350 000 kWh

Coverage of consumption

560 households per year

Emissions savings

~ 1 645 tons of CO₂